Downtown Construction and Road Closure Updates

Downtown Detroit Event Road Closures

Detroit Tree Lighting | Friday, November 20

Tree Lighting closures began Wednesday, November 18 at 6:00 a.m. Roads will reopen on Saturday, November 21 at 6:00 a.m.

Closure Locations:

  • Woodward between State and Congress (around Campus Martius Park)

  • Michigan between Woodward and Griswold

  • Fort between Woodward and Griswold

  • Cadillac Square between Woodward and Bates

  • Monroe between Woodward and Farmer

  • Woodward between Congress and Larned (only November 20)

Please see the map below for the full road closures and foot print maps.

Thanksgiving Day Parade | Thursday, November 26

Please click here to view closure maps for the 2026 Thanksgiving Parade and Turkey Trot

Closure Locations:

  • Wed., Nov. 25 at 9:00 a.m. to Thur., Nov 26 at 4:00 p.m.
    Full closure NB/SB Woodward between Grand Boulevard and Warren

  • Wed., Nov. 25 at 12:00 p.m. to Thur., Nov 26 at 4:00 p.m.
    Full closure NB/SB Woodward between Warren and Congress

  • Thur., Nov. 26 at 6:00 a.m. to 11:00 a.m.
    Ramp closure NB/SB M-10 to W Jefferson (should remain closed this year with active adjacent Second Ave construction project)

  • Thur., Nov. 26 at 6:00 a.m. to 1:00 p.m.
    Ramp closure SB M-10 to Larned (should remain closed this year with active adjacent Second Ave construction project)

  • Thur., Nov. 26 at 6:30 a.m. to 11:00 a.m.
    Full closure EB/WB Fort between Tenth and Griswold

  • Cross streets at Woodward that remain open to East-to-West traffic only will be stop-sign controlled until full closure of the parade route at 5:00 a.m. Thursday

    • Grand Blvd, Warren, Alexandrine, MLK/Mack, I-75 Service Drives, Adams, Park/Witherell, Clifford/John R, Grand River, Campus Martius North, Michigan Ave, Campus Martius South

Downtown Detroit Road Projects

Click here to get additional details from the City of Detroit.

Michigan Avenue Streetscape

Michigan Avenue between Woodward Avenue and Griswold Street will be fully closed through Monday, November 23. 

Two lanes of traffic will remain open west of Griswold Street. Please follow all posted detour signs and designated routes. 

The City of Detroit has begun construction along Michigan Ave from Cass Ave to Woodward Ave and Lafayette Blvd from Shelby St to Griswold St. The project will include resurfacing of roadways, sidewalk and curb reconstruction, traffic signal upgrades, and new landscaping.

To learn more, see the City’s flyer here and on their webpage here.

Gratiot (M-3)/Dequindre Cut Bridge Repair

Weather permitting, crews will close northbound I-75 Exit 51B to M-3 (Gratiot Avenue) in Detroit for pavement repair. The closure begins on Friday, Oct. 2 at 7:00 p.m. and it will be opened by 5:00 a.m. on Monday, Oct. 5. 

  • Initial stage requires lane closures on the northbound and southbound Gratiot Connector between Russell and Orleans streets.   
  • Starting next month, lane closures will be in place on M-3 between the Gratiot Connector and St. Aubin Street. 
  • The closure begins on FridaWater main relocation is required prior to removing and replacing the M-3 (Gratiot Avenue) bridge over the Dequindre Cut.
  • Click here for MDOT interactive map.

Ongoing through late November (midrive)

  • Southbound I-75 exit to northbound Gratiot Connector closed.
  • Northbound Gratiot Connector one lane open from I-375 to M-3.
  • Southbound Gratiot Connector one lane open from M-3 to I-75. 
  • Two lanes closed on eastbound M-3 from Rivard to St. Aubin.
  • Two lanes closed on westbound M-3 from St. Aubin to the Gratiot Connector. 

Broadway Lofts Development

Closure:

  • Closure of westbound Broadway between Gratiot and Grand River


Reminder:

  • Limited sidewalk access on the north side of Broadway

Detroit Free Press Marathon | Sunday, October 18, 2026

The Detroit Free Press Marathon brings hundreds together to experience something unique to Detroit — the only international marathon in North America where participates cross into Canada over the Ambassador Bridge at sunrise, then return to the United States through the Detroit-Windsor Tunnel. 

Please see the map below for the full road closures and foot print maps.

Detroit Tree Arrival | Wednesday, November 4

Tree Arrival closures are on Wednesday, November 4 from 8:00 a.m. until 4:00 p.m.

Closure Locations:

  • Woodward Avenue at Campus Martius Park

  • Monroe Street and Woodward Avenue (at Campus Martius Park)

  • Farmer Street from Monroe Street to Bates Street

  • Cadillac Square and Woodward Avenue

Please see the map below for the full road closures and foot print maps.